Solution
Optimal BESS Sizer : analyse financière
Industrial battery returns in French-speaking Switzerland: why a spreadsheet is no longer enoughNews

Industrial battery returns in French-speaking Switzerland: why a spreadsheet is no longer enough

October 30, 20262 min Read More
Tarifs de puissance 2027 des GRD de Suisse romande
Power tariffs 2027: what changes at 10 French-speaking Swiss DSOsNews

Power tariffs 2027: what changes at 10 French-speaking Swiss DSOs

October 31, 20263 min Read More
Optimal BESS Sizer : balayage des tailles de batterie
Industrial battery: 8 questions to ask before signingNews

Industrial battery: 8 questions to ask before signing

October 30, 20263 min Read More
Fenêtre de facturation de la pointe 2027, 10 GRD romands
Power peaks in 2027: billed for 1 month or 12, depending on your DSONews

Power peaks in 2027: billed for 1 month or 12, depending on your DSO

October 31, 20263 min Read More
“

Today, if I had the possibility to benefit from on-demand flexibility of minimum 5 MW, I would have signed a contract of 1 to 3 years

A key energy producer & distributerin Switzerland
“

…financial hedge against uncertainty for my clients is a desirable solution…

Eastern of SwitzerlandAn energy trader, member of Swissgrid’s balance group
“

The investors are worried about the sustainability of revenues of “ancillary services”. If you can propose them a way to diversify their revenue streams, they will be happy. Let me know when you’re ready!

An engineering office advising Large-scale battery investors
“

Currently we have longterm contracts with off-takers and we have doubts on their performance, if we had a solution to be able to compare 2 off-takers with one of my physical batteries for a 6-month period, it would have solves the problem...

A battery site owner in Lausanne region